Water supply of the municipalities of Espunyola, Montclar, Montmajor, Navès and Viver i Serrateix from the Sant Ponç reservoir

Water supply of the municipalities of Espunyola, Montclar, Montmajor, Navès and Viver i Serrateix from the Sant Ponç reservoir

The Project consists of the water supply of the municipalities of La Espunyola, Montclar, Montmajor, Navès and Viver i Serrateix. To this end, the following was executed:
– An intake in the Sant Ponç reservoir.
– Three reservoirs, two of 1000 m3 and one of 500 m2.
– Two pumping stations to pump 20 l/s at 100 mwc.
– A drinking water treatment plant with a capacity of 25 l/s.
– Ductile iron pipe of 10 km, DN 150 mm.
– HDPE pipe of 12 km, DN 110 – 180 mm.
Emergency construction supervision, including quality control, carrying out material quality tests and execution according to the own control plan.
– Budget and schedule monitoring of the works.
– Preparation of monthly and specific reports.
– Review of the final settlement.
– Drafting of the “As built” document.