Ebro River bypass. Works.
– Completion time: 43 months.
– Construction of a 6.7 km bypass around an urban center with 3 interchanges, featuring parameters specific to expressways.
– Typical section: conventional two-lane road with a width of 3.50 m per carriageway, two 1.50 m emergency stopping lanes, and 1.90 m and 0.90 m shoulders, designed to allow for future widening of the carriageway.
– Hot mix asphalt: 32,243 metric tons.
– Earthworks: 1,322,726 m³ of excavation and 716,247 m³ of fill.
– Engineering structures: 2 bridges of 43 m, overpasses of 69 m, 6 underpasses, and 1 reinforced earth wall of 200 m.